|
|
|
Battery Charger Control
The system provides schedule control to eliminate or minimize on-peak demand and energy use for facilities with time-of-use electric rates. Up to four zones of control are available, with individual time schedules and overrides. The i.LON100 includes web pages for user interface, allowing monitoring, schedule changes and overrides to be accomplished using a web browser on a local PC, or via a dial up modem connection. Options:
Product Brochures (requires Adobe Reader)
|
Copyright © 2005
VaCom Technologies
|